Vermeer Site Services - Installation

We recently posted the delivery of an exchanger used in the waste incineration process.

Our Vermeer Sites Services team, led by one of our project managers, assisted the client with the installation of the heat exchanger on site. With an empty weight of 22.500 kg. Lifting the exchanger is a delicate job. Even more so, lowering it very precisely through the roof of the factory and placing it on the wire ends of the base.

At request, our dedicated professional on site services team is available 24/7. With decades of experience, we do not only assist at installation but with our mobile equipment we provide complete heat exchanger services on site.

Don’t hesitate to contact us with your requirements and we’ll be happy to discuss the possibilities with you.

Take a look at the below pictures.

Other news

13/03/2024

RAMADAN KAREEM

read more
02/03/2024

Unveiling the Future of Sulfur Solutions

Introducing the thermal maintenance system, designed and manufactured by Vermeer Thermex International. In a rapidly evolving petrochemical landscape, staying ahead means embracing

read more