Vermeer Site Services - Installation

We recently posted the delivery of an exchanger used in the waste incineration process.

Our Vermeer Sites Services team, led by one of our project managers, assisted the client with the installation of the heat exchanger on site. With an empty weight of 22.500 kg. Lifting the exchanger is a delicate job. Even more so, lowering it very precisely through the roof of the factory and placing it on the wire ends of the base.

At request, our dedicated professional on site services team is available 24/7. With decades of experience, we do not only assist at installation but with our mobile equipment we provide complete heat exchanger services on site.

Don’t hesitate to contact us with your requirements and we’ll be happy to discuss the possibilities with you.

Take a look at the below pictures.

Other news

17/03/2025

Titanium Dump Condensor

New dump condenser including sump was shipped and installed for a client in the Rotterdam Botlek region last Friday. The unit is equipped with 1300+ titanium 1-1/4” tubes and chann

read more
25/02/2025

GUYANA ENERGY CONFERENCE 2025

The Guyana Energy Conference is an annual event that brings together industry leaders, policymakers and stakeholders to discuss the latest developments, challenges, and opportuniti

read more