We recently posted the delivery of an exchanger used in the waste incineration process.
Our Vermeer Sites Services team, led by one of our project managers, assisted the client with the installation of the heat exchanger on site. With an empty weight of 22.500 kg. Lifting the exchanger is a delicate job. Even more so, lowering it very precisely through the roof of the factory and placing it on the wire ends of the base.
At request, our dedicated professional on site services team is available 24/7. With decades of experience, we do not only assist at installation but with our mobile equipment we provide complete heat exchanger services on site.
Don’t hesitate to contact us with your requirements and we’ll be happy to discuss the possibilities with you.
Take a look at the below pictures.
Next up is the Heat Exchanger Exhibition 2024 on 13 and 14 November 2024 in AHOY Rotterdam. Please feel free to join us on stand B20. The Heat Exchanger World Expo 2024 will be a m
Angola has been an important geographical area for the VE GROUP. Since 10 years we work for the major end clients in the country and in partnership with Graham Manufacturing we are