Vermeer Site Services - Installation

We recently posted the delivery of an exchanger used in the waste incineration process.

Our Vermeer Sites Services team, led by one of our project managers, assisted the client with the installation of the heat exchanger on site. With an empty weight of 22.500 kg. Lifting the exchanger is a delicate job. Even more so, lowering it very precisely through the roof of the factory and placing it on the wire ends of the base.

At request, our dedicated professional on site services team is available 24/7. With decades of experience, we do not only assist at installation but with our mobile equipment we provide complete heat exchanger services on site.

Don’t hesitate to contact us with your requirements and we’ll be happy to discuss the possibilities with you.

Take a look at the below pictures.

Other news

07/11/2024

ADIPEC 2024 - ABU DHABI

The VE GROUP attended the Abu Dhabi International Petroleum Exhibition and Conference (ADIPEC) 2024 in Abu Dhabi, UAE. The event provided an excellent platform for the VE GROUP to

read more
01/11/2024

HAPPY DIWALI TO ALL OUR FRIENDS

read more