Contractor/client: Bumi Armada
Project: Angola 15/06
Download below case study for more project information
Case study: Bumi Armada
Stacked Feed Effluent exchangers during pressure test at 116 barg for one of our clients in Denmark 🇩🇰. Exchangers are made of 40 mm Grade 12 material and internally cladded with S
Vermeer new build condenser train that consists of 16 Fin Fan Coolers connected to one header is being installed at clients refinery in Nigreria as part of the revamp of the FCCU U