Helixchanger® Helitower installation

The Helixchanger® Helitower that Vermeer Eemhaven International has designed and manufactured in 2023 for our German client was succesfully installed and commissioned on the plant in September

See the below pictures of what this delicate installation process looks like.

The Helixchanger® Helitower is a special design Texas Tower build under license of Lummus Technology’s Helixchanger ® heat exchanger technology.

The technology is based upon a helical flow principle. The corkscrew flow results in better heat dissipation and a reduced pressure drop. Helixchanger® heat exchangers are energy-efficient and produce less pollution than traditional shell and tube exchangers.

Other news

08/10/2025

VE GROUP OCTOBER UPDATE

This October, our teams continue to drive progress across several major heat exchanger projects. From our busy workshops to installations worldwide, we are proud to highlight the c

read more
04/09/2025

AOG 2025 ANOTHER SUCCESS

Once again we look back on a very successful oil & gas conference in Luanda, Angola. The Angola Oil & Gas 2025 conference in Luanda delivered outstanding networking opportu

read more